image services

GPP provides solutions that include engineering support, project management and capable assets, all delivered by a proven team with an extensive track record.

Our high-performance trenching systems enable us to undertake projects which require precise installation in challenging seabed environments.

  • Pre-Trenching & Post-Trenching.
  • Bury or Expose Active & Inactive Pipelines.
  • Trenching to > -16’ (4.88 m) Below Mud Line (BML).
  • Conventional Single & Dual Stage Pull Sleds.
  • Self Propelled Burial Sled For “Active” Pipeline Burial.
  • Self Propelled Pipeline Excavation Sled.
  • High Pressure/High Performance Portable Jet Pumps.

GPP Construction Equipment Corp.

Let us help you with your next project

Contact Us